Integration event statuses
Adapty determines deliverability based on the HTTP status code, considering any response outside the 200-399 range as a failure.
You can track the status of integration events in the Event List within the Adapty Dashboard. The system displays statuses for all enabled integrations, regardless of whether a specific event type is turned on for a given integration.
- Black: The event was successfully sent.
- Grey: The event type is disabled for this integration.
- Red: There is an issue with the integration that requires attention.
For more details on failed events, hover over the integration name to see a tooltip with specific error information.
If the event is completely missing, An event is missing from the feed lists the reasons.