Integration event statuses

Adapty determines deliverability based on the HTTP status code, considering any response outside the 200-399 range as a failure.

You can track the status of integration events in the Event List within the Adapty Dashboard. The system displays statuses for all enabled integrations, regardless of whether a specific event type is turned on for a given integration.

  • Black: The event was successfully sent.
  • Grey: The event type is disabled for this integration.
  • Red: There is an issue with the integration that requires attention.

For more details on failed events, hover over the integration name to see a tooltip with specific error information.

Event list showing a delivery status for each integration

If the event is completely missing, An event is missing from the feed lists the reasons.